Fwd: Alternative Sidewalk Plan Over Bridge Creek Culvert @ 143 &137 Evergreen Ave

On Jun 29, 2012, at 9:10 PM, Keith Garriott wrote:

> FYI
>
> ---------- Forwarded message ----------
> From: "Schneider, Scott" <SSchneider@marincounty.org>
> Date: Fri, 29 Jun 2012 16:53:44 -0700
> Subject: RE: Alternative Sidewalk Plan Over Bridge Creek Culvert @ 143
> &137 Evergreen Ave
> To: Keith Garriott <saveevergreenave@gmail.com>
> Cc: "Lum, Anthony" <ALum@marincounty.org>, "Beaumont, Bob"
> <BBeaumont@marincounty.org>, "Klock, Ernest" <EKlock@marincounty.org>,
> "Kinsey, Steven" <SKinsey@marincounty.org>
>
> Hi Keith,
> Thank you for your thoughtful design. I was very impressed with
> your drawing.
>
> We discussed your design within our Division. We have some concerns
> about the additional load that the sidewalk would place on the bridge,
> and we are analyzing that now.
>
> I will be meeting with staff in the field on Monday to further review
> the area around the bridge.
> Scott
>
>Scott Schneider, P.E.
> ASSOCIATE CIVIL ENGINEER
>
> County of Marin
> Department of Public Works
> 3501 Civic Center Drive, Suite 404
> San Rafael, CA 94903
> 415 473-4362 T
> 415 473-3724 F
> CRS Dial 711
> sschneider@marincounty.org
>
> -----Original Message-----
> From: Keith Garriott [mailto:saveevergreenave@gmail.com]
> Sent: Friday, June 29, 2012 9:06 AM
> To: Schneider, Scott
> Cc: Lum, Anthony; Beaumont, Bob; Klock, Ernest; Kinsey, Steven; info
> Subject: Fwd: Alternative Sidewalk Plan Over Bridge Creek Culvert @
> 143 &137 Evergreen Ave
>
> Hi Scott,
>
> I was wondering if you had time to take a look at the drawings I sent
> of the sidewalk area at the bridge.
>
> The dimensions are correct on the plan view, but I wrote the wrong
> degree of cross slope on the side ramps to the driveway.
>
> The correct cross slopes for drawings:
>
> Eastside sidewalk ramp drop is 5/8'' per ft. (approx. 8 ft in length
> with expansion joint). (At the bridge)
>
> Driveway approach apron is 1/4" per ft. (2%)
>
> Westside sidewalk ramp drop is 1" per ft. (5 ft. in length) (near
> #199)
>
> Sidewalk surface grade is a 2% slope toward curb & gutter.
>
> I figure that the sidewalk ramp at the bridge would start at the
> elevation of the bridges top surface which is planned as the gutter of
> that portion of the plan.
>
> The ramp would level to the finish surface of the sidewalk before the
> walkway in front of the existing fence gate to the house.
>
> Thanks for your time reviewing if this could be included in the
> final plan.
>
> Keith Garriott
>
---------- Forwarded message ----------
> From: Brian Spring <bkspring@gmail.com>
> Date: Thu, 28 Jun 2012 11:32:03 -0700
> Subject: Re: Alternative Sidewalk Plan Over Bridge Creek Culvert @ 143
> &137 Evergreen Ave
> To: Keith Garriott <saveevergreenave@gmail.com>, Charlessands
> <charlessands@aol.com>, Mari Tamburo <drive@avehicleforchange.org>
>
> Nicely done Keith.
> They could apply a new, almost weightless topping to the walking
> surface of the bridge deck, using one of the epoxy/sand adhesives,
> which are used
> everywhere now days. I hope they don't intend to leave that surface
> un-improved.
>
>
> Brian Spring
> cell: 415 497-2880
> email: bkspring@gmail.com
>
>
>
> On Thu, Jun 28, 2012 at 9:05 AM, Keith Garriott
> <saveevergreenave@gmail.com>wrote:
>
>> FYI
>>
>> Wed, Jun 27, 2012 at 4:49 PM
>> To: Keith Garriott <saveevergreenave@gmail.com>
>> Cc: "Beaumont, Bob" <BBeaumont@marincounty.org>, "Klock, Ernest"
>> <EKlock@marincounty.org>, "Lum, Anthony" <ALum@marincounty.org>,
>> "Kinsey, Steven" <SKinsey@marincounty.org> Reply | Reply to all |
>> Forward | Print | Delete | Show original
>>
>> Hi Keith,
>> Thanks for your email.
>> We'll take a look at it tomorrow and get back to you.
>> Scott
>>
>>
>> Scott Schneider, P.E.
>> ASSOCIATE CIVIL ENGINEER
>>
>> County of Marin
>> Department of Public Works
>> 3501 Civic Center Drive, Suite 404
>> San Rafael, CA 94903
>> 415 473-4362 T
>> 415 473-3724 F
>> CRS Dial 711
>> sschneider@marincounty.org
>>
>> Follow us on Facebook and Twitter
>>
>> - Show quoted text -
>> Email Disclaimer: http://marincounty.org/nav/misc/EmailDisclaimer.cfm
>>
>> --------- Forwarded message ----------
>> From: Keith Garriott <saveevergreenave@gmail.com>
>> Date: Wed, 27 Jun 2012 16:18:00 -0700
>> Subject: Alternative Sidewalk Plan Over Bridge Creek Culvert @ 143
>> &137 Evergreen Ave
>> To: "Schneider, Scott" <SSchneider@marincounty.org>
>> Cc: "Beaumont, Bob" <BBeaumont@marincounty.org>, eklock
>> <eklock@co.marin.ca.us>, "Lum, Anthony" <ALum@marincounty.org>,
>> "Kinsey, Steven" <SKinsey@marincounty.org>
>>
>> Hi Scott,
>>
>> I'm sending you an alternative sidewalk plan for the bridge location
>> on Evergreen Ave.
>>
>> The current plans call for a surface elevation drop from the planned
>> sidewalk elevation from # 143 driveway to a transition ramp to the
>> existing surface elevation of the bridge, using the bridge top as
>> finished sidewalk with a raised 6' curb, and a transition up to the
>> surface elevation of the continued planned sidewalk installation.
>>
>> The problem I have with that is stormwater related, tripping hazard,
>> and aesthetics.
>>
>> When in heavy rains, water typically runs from Linden Lane down
>> Evergreen's south side. The transition from the driveway to the
>> bridge
>> would cause water to puddle because of the existing wall of the
>> bridge
>> and an existing curb on the bridge that helps stop water runoff to
>> the
>> edge of bridge to the creek causing erosion on the corner of the
>> adjacent lot.
>>
>> The bridge surface is also considered a rat slab and doesn't look
>> aesthetically pleasing compared to a new sidewalk that will be
>> joining
>> it.
>>
>> With the plan I have...the sidewalk would include a ramp up less than
>> the ADA required 2%. The sidewalk on top of the bridge would be the
>> same elevation as the planned top of curb, and eliminate the need to
>> transition back up to meet the continued sidewalk at #137's driveway.
>>
>> This plan would eliminate the potential water puddling and also look
>> better aesthetically.
>>
>> I'm aware of the potential for cracks along the bridge edges with the
>> new concrete on the old concrete. My plan includes an expansion joint
>> on each side of the bridges edges to mitigate that problem. I also
>> estimate that asphalt would be the choice of material to use for the
>> sidewalk over the bridge because of the existing road being asphalt,
>> because of it's flexibility compared to concrete, and the design of
>> the rat slab to adhere to the asphalt.
>>
>> The load bearing shouldn't be an issue due to the area of the bridge
>> that my plan proposes to be a sidewalk, would be comparable per sqr.
>> ft. as approximately two parked cars.
>>
>> I know it's a last minute effort, but I think this would be worth the
>> second look to see if this could be included in the new sidewalk
>> plans.
>>
>> Sincerly,
>>
>> Keith Garriott
>>

Sunday, June 10, 2012

I'M ASKING DPW TO IMMEDIATELY DELAY THE START OF CONSTRUCTION OF EVERGREEN AVE'S NEW STREET PLAN WITH SIDEWALK TO ALLOW THE RESIDENTS A FULLY VISIBLE & UNDERSTOOD MOCK-UP.

Marin County DPW & Supervisor Kinsey,

I'M REQUESTING ON BEHALF OF MYSELF AND THE CONCERNED RESIDENTS WHO
HAVE VOICED THEIR OPINIONS AND HAVE UNANSWERED QUESTIONS ABOUT THE
NEWLY PLANNED ROAD WIDTHS AT LAST THURSDAY NIGHT'S PRELIMILARY
CONSTRUCTION MEETING FOR THE EVERGREEN AVE SIDEWALK, HELD ON JUNE 7th
2012, THAT THE MARIN COUNTY DEPARTMENT OF PUBLIC WORKS WILL DELAY THE
START OF CONSTRUCTION IMMEDIATELY SCHEDULED FOR JUNE 11th 2012, UNTIL
THE DESCRIBED AREAS OF CONCERN THAT RESIDENTS SPOKE ABOUT AT THE
MEETING ARE ADDRESSED ON THE NEW STREET PLAN FOR EVERGREEN AVENUE.

I'M ASKING THAT THE MARIN COUNTY DEPARTMENT OF PUBLIC WORKS WILL ALLOW
THE RESIDENTS OF EVERGREEN AVE & IN THE HOMESTEAD VALLEY AREA WHO USE
THIS STREET ON A DAILY BASIS "A PROPER FULL SCALE MOCK-UP UTILIZING
CONES LINED WITH REFLECTORS MARKING THE CURRENT STREET DESIGN PLAN'S
DIMENSIONS ALL ALONG THE GROUND BEFORE THE START OF ANY CONSTRUCTION."

THIS ROAD APPARENTLY HAS NOT BEEN THOROUGHLY STUDIED BY THE TRAFFIC
ENGINEERS....THIS SHOULD HAVE BEEN DONE MONTHS BEFORE THE FINAL
MEETING & START OF CONSTRUCTION DATE FOR THE REDEVELOPMENT OF THIS
RESIDENTIAL STREET AND IT'S ROAD INTEGRITY.

I'M BASING THIS STATEMENT ON MY OWN FINDINGS WHEN UTILIZING THE
CURRENT SURVEY MARKS ON THE ROAD THAT DESIGNATE THE NEW STREET PLAN
LAYOUT.

BY PARKING MY CARS WITHIN THE PROPOSED DIMENSIONS OF THE FOG LINE AND
CURB AT VARIOUS SECTIONS OF THE STREET, I WITNESSED POTENTIAL NEGATIVE
IMPACTS WHEN OBSERVING THE MOVING VEHICLES IN THE TRAVEL LANES, WHICH
ARE TO BE REDUCED IN WIDTH FOR THE INSTALLATION OF A SIDEWALK ON THE
SOUTH SIDE OF EVERGREEN AVE. .

There should be a full mock-up performed of both the north & south
sides of the street from start to end locations of proposed new
sidewalk.

This should be a mock-up that is clearly understood by the residents,
designating the points of right away for vehicle travel lanes, off
street parking, & pedestrian right of way.

The residents need their concerns addressed by their DPW to assure
that when the current road is improved on the new street plan, that it
is fully a change best for all parties involved.

At this time, I feel that the residents of this street have little or
no representation about the concerns pending.

PLEASE RESPOND IMMEDIATEY TO THIS REQUEST.

Sincerly,

Keith Garriott

(Evergreen Ave Resident Of 16 Years)

A Concerned Resident's Observation About The Planned Sidewalk Construction On Evergreen Avenue.

Fellow Homestead Residents & Travelers of Evergreen Avenue,

It's been a long haul since residents first heard of the County's
plans for a sidewalk to be built on our beloved semi rural Evergreen
Avenue in Homestead Valley.

After interviewing many residents of this area during circulating a
petition against it's initial design, I found that many were for the
proposal of a "sidewalk that wasn't so wide for the street.".

I also welcomed the idea of this additional improvement on our
street...But at the same time was concerned with the design process of
such a change to this street's aesthetics.

There's been many meetings attended to...but it seems the residents
who live in this area seem to be put on the back burner, as far as the
County's agenda is concerned about this project.

Last Thursday night at the "last minute pre-construction meeting" for
the new street plan for a 4.5 wide sidewalk on Evergreen Avenue, I
stated that the results I found of the so called mock-up (back of
sidewalk stakes and curb markers only in two locations & not visible
when driving on the road) show the road being pushed over to the north
side approx. 3 ft. starting from Evergreen Ave xs. Linden Lane to the
curve in road to xs. Ethel Ave. This is also true on the upper section
of Evergreen Ave near Volunteer Park.

This factor causes potential negative impacts in the roads
functionality in the new street plan verses the street left as is.

I've chalked marked the center of road and have driven these parts of
concern at night when parked cars line the edge of road and found this
to be so.

I've parked my cars within the proposed fogline marks and found
significant negative factors to be true within the proposed reduced
widths in the travel lanes when witnessing the performance of the
moving vehicles passing these areas.

Narrowing the street to mitigate cars from potentially speeding may or
may not work.
It shouldn't overpower the fact that narrowing the road in some parts
may cause other road hazards.

A road study from the traffic engineer should result in more 25 mph
signs posted and painted in these areas. This would be more of a
solution in my opinion.

I thought we were going to solve this problem when the sidewalk was
reduced in width from the original 6 ft. wide plan in 2010.

Old Mill School on Throckmorton Ave & Old Mill currently has 12ft.
wide lanes and 8 ft. compensated for off street parking right in front
of the school.

Why does Evergreen Ave need to be required 11 foot lanes from start to
finish without compensating for certain conditions in the road, such
as:
The street is not perfectly straight in the first place; There was
never a curb located at the section of Evergreen Ave between xs.
Linden Lane and Ethel Ave; nor was there one between xs. Melrose and
Scott.

The most potential areas for road safety hazards in the travel lanes
if reduced in width from the original street are:

The curve in road between Ethel Ave and Linden Lane;
Stop intersection at north side of Evergreen Ave & Linden Lane;
North side of street erosion from creek at Evergreen Ave near Volunteer Park.

My suggestion is to have the new sidewalk brought closer to the fence
lines approximately 2 to 3 feet at these areas to widen the road and
eliminate the potential hazards of making these areas worse.

I understand the fact that DPW incorporated in the new street plan the
design of a narrower road with 11 foot travel lanes throughout the
entire street length with intentions for a "traffic calming effect" on
potential speeding cars.

The fact is: FROM CROSS STREET'S SCOTT TO LINDEN LANE ON EVERGREEN
AVE, THERE ARE ALREADY TRAVEL LANES OF APPROX. 11 FT. WIDE WITH AN
EXISTING CURB AND WALKING PATH ON THE SOUTH SIDE.

I WITNESSED THAT THIS SECTION OF STREET DOSEN'T PREVENT CARS FROM
SPEEDING ON EVERGREEN AVE WITH CARS PARKED WITHIN THE NEW FOG LINE
DIMENSIONS OF THE NEW STREET PLAN!

I wished DPW would have allowed us a full mock-up of the road in the
first place when the sidewalk was first proposed so we could see the
impacts created from this new plan. It only makes sense to do this on
an existing street with no major past road hazard incidents, except
for the few fender benders that occured over 10 years ago at the
Linden Lane stop intersection on the north side of Evergreen Ave. This
intersection has always been an issue, maily because of turning from
Evergreen Ave onto Linden Lane which is such a narrow road.

I spoke about a number of these issues at the meeting trying to get
residents aware of the possible unforseen safety hazards that will
possibly occure in the road's integrity concerning motor vehicles,
bicyclists, pedestrians, & wheelchair use when changing an existing
street with characteristics as this one.

I thought that was what public input was about?

I'm not questioning our DPW's professionalism on designing a road like
this...it's just that the residents may know things that can be
helpful in lending a hand in the design process.

There's still pending issues with this new design for this street.

I wish the last meeting wasn't so close to the start of construction date.

WE HAVE TO TAKE TIME TO ADDRESS THESE ISSUES BEFORE ANY CONSTRUCTION IS STARTED!

Best Regards,

Keith Garriott

(Evergreen Ave Resident)

Sunday, June 3, 2012

Mock-Up Of Evergreen Avenues Proposed Sidewalk Set For Tuesday Afternoon

To all concerned Homestead residents,

I was notified that the Department Of Public Works will be performing
a mock-up of the proposed Evergreen Ave sidewalk's finish curb
locations, indicating the sense of what the new street plan travel
lanes will be like after the sidewalk's installed.

The mock-up would be done on Tuesday late afternoon: June 5.

Residents are encouraged to voice their concerns about the Evergreen
Avenue street plan on Thursday June 7, 2012 at 6 PM @ the Mill Valley
City Hall, City Hall Council Chambers, 26 Corte Medera Ave, Mill
Valley.
.

Hope to see you all there,

Best Regards,

Keith Garriott

Friday, June 1, 2012

Preconstruction Mock-Up Of Proposed Evergreen Ave Sidewalk In Homestead/Mill Valley.

Bcc: Save Evergreen Ave Residents, HearUs, Madrone Park Circle Group,
HVCA, & MHS.

Subject: Evergreen Ave Sidewalk To Be Constructed.

As a resident for 16 years on Evergreen Ave and on behalf of many
concerned Homestead homeowners & residents who use this street on a
daily basis, I'm asking DPW to conduct a "Preconstruction Mock-Up At
Points Of Most Concern For Road Safety On Evergreen Avenue With The
Addition Of A Proposed 4.5 Concrete Sidewalk With Curb & Gutter."

This mock-up would show how the installation of a new sidewalk on the
south side of the street would possibly cause an impact on the road
safety for anyone that uses the road such as driving, bicycling, &
wheelchair use.

The mock up should be conducted prior to the final DPW sidewalk
preconstruction meeting scheduled on June 7th. Residents could express
their concerns about the proposed sidewalks possible impacts on the
street compared to the current state the street has been in for many
years with a perfect safety record for pedestrians not being in danger
of cars.

The mock-up would simply consist of chalk lines or cones placed on the
south side of the street representing the finish curb of the proposed
sidewalk at three points of most concern.

Those points of most concren are at: Evergreen Ave & Melrose (along
side Volunteer Park); Evergreen Ave & Linden Lane (across from the
north side of Evergreen Ave & Linden Lane intersection); & at the
curve in the road on Evergreen Ave heading northbound to Ethel Ave.

At these points with chalk lines or cones placed approximately 100 ft.
in length would be sufficient in giving the residents an idea of how
their street's travel lane safety will be impacted (whether positive
or negative).

I believe that this is something the residents deserve who use this
street consistently, to reassure them that this latest version of the
new street plan is best for our green semi rural neighborhood
thoroughfare.

At the upcoming meeting, I hope that we could resolve whatever issues
the residents may have after the mock-up of the new street plan before
Evergreen Avenue is changed forever.

Thank you for your cooperation and patience in working with the
Evergreen Avenue & Homestead residence.

Please respond to us about this proposal of the mock-up.

Sincerly,

Keith Garriott

Saturday, April 9, 2011

Latest Update About Evergreen Ave Sidewalk Plans

Bcc: SaveEvergreen, HearUs, Madrone Park Circle Group,

Hello Neighbors,

This is the latest information from Supervisor Kinsey about the
Evergreen Ave Sidewalk Project.

Please email me if you have any questions about the plans and foward
this email to your neighbors in Homestead who would like to know more
information about the Evergreen Avenue project.

Cheers,

Keith Garriott

saveevergreenave@gmail.com

---------- Forwarded message ----------
From: "Kinsey, Steven" <SKinsey@co.marin.ca.us>
Date: Fri, 8 Apr 2011 16:29:37 -0700
Subject: RE: Evergreen Avenue Sidewalk Grant Request
To: Keith Garriott <saveevergreenave@gmail.com>

Keith,

I have asked DPW to meet with me prior to re-submitting their
application. At that time, I will confirm what width of walkway will be
proposed. As soon as the meeting occurs, I will communicate the
specifications that are being requested. You are always welcome to
convey your own ideas to DPW.

SK

-----Original Message-----
From: Keith Garriott [mailto:saveevergreenave@gmail.com]
Sent: Monday, April 04, 2011 1:16 AM
To: Kinsey, Steven
Cc: Crosse, Liza
Subject: Evergreen Avenue Sidewalk Grant Request

Supervisor Kinsey,

I would like to know what is going to be the width of the Evergreen
Avenue sidewalk on the grant request to be re-submitted to the State?

Melrose to Scott:

Scott to Linden Lane:

Linden Lane to Ethel Ave:

I would also like to know if DPW is accepting alternative ideas from
residents for the Evergreen Avenue street plan?

Thanks,

Keith Garriott

Thursday, March 31, 2011

Resident's Recent Email About Sidewalk Project Was Responded To By Supervisor.

Hello Neighbors,

This is an updated response from Supervisor Kinsey to an email from
Evergreen Ave resident Diane Mamura concerning the current status of
the the lingering "Evergreen Sidewalk Saga" that's been going on here
in Homestead since July 2010. This is just to keep everybody in the
loop...it's still going on.

If any residents have some new idea's about what should be done to the
future of Evergreen Avenue, please feel free to share your views with
us!

You can send you email to:

hv94941.bsbin@blogger.com, SaveEvergreenAve@gmail.com

Cheers,
Keith

-----Original Message-----
From: "Kinsey, Steven" <SKinsey@co.marin.ca.us>
Sent: Tue, 22 Mar 2011 13:55:06 Pacific Daylight Time
To: dmamura@comcast.net
Subject: RE: Status of proposed Evergreen Avenue sidewalk plans

At the present time there is no new information that I can offer. I have
previously shared my perspective with the community and the DPW.

DPW will need to re-submit the grant request to the State to get
permission for the narrower sidewalk. In addition, I am trying to get
the Marin Board of supervisors to adopt a policy that would accommodate
a different color of ADA warning device in the sidewalks at
intersections.

I believe that it will be a few months before answers to these questions
arrive. Once the information is in, I will notify the community of the
results through Homestead Headlines.

Steve

________________________________

From: dmamura@comcast.net [mailto:dmamura@comcast.net]
Sent: Thursday, March 17, 2011 8:51 PM
To: Kinsey, Steven
Cc: Crosse, Liza; saveevergreenave@gmail.com
Subject: Status of proposed Evergreen Avenue sidewalk plans

Dear Supervisor Kinsey:

As you can imagine, many of the residents on the south side of Evergreen
Avenue and Homestead Valley are interested in receiving an update from
you regarding the proposed Evergreen Avenue sidewalk plans. We await
your response.

Thank you.

D. Mamura,

a resident of Evergreen Avenue